Collection | home| 中文| 英文版
Collection | home| 中文| 英文版
Corporate History
Corporate History
2017
-Set up Rossum Hydrogen in Hunan
2018
- MEA full process pilot line equipment (coating, encapsulation, testing)
delivery, commissioning, pilot production
2019
- The first fully automated MEA full process production line in China was delivered for trial production
CCM roll-to-roll double-sided coating line delivered and put into production
GDL sheet full production line (hydrophobic, coating, sintering) delivered and put into production
2020
- Certified as a national high-tech enterprise
Hydrogen production line "China Good Technology"
MEA high-speed packaging line (10PPM) was put into production
Automatic assembly line for screw reactor/steel strip reactor delivered and put into production
The first CCM roll-to-roll double-sided thermal transfer production line in China was delivered for trial production
2021
- Passed ISO Quality System Certification
GG Hydrogen Global Innovative Technology of the Year Award
CCM high-speed double-sided coating line (25m/min) completed for project closure
GDL roll-to-roll complete production line (hydrophobic, coating, sintering) delivered and put into production
2022
- Delivery of PEMWE sheet thermal transfer equipment
GG Hydrogen & Electric Golden Globe Product Innovation & Technology Award
Delivery of the first hydraulic continuous press in China
Delivery of PEMWE pilot line (coating, encapsulation, electrolysis tank)
Delivery of Liquid Flow Battery Electrolyzer Tank Setting Equipment
Delivery metal bipolar plate dispensing production line
2023
- Established Technology Innovation Research Institute with Donghua University
Delivered PEM electrolyzer MEA maximum wide width fully automated packaging line
Awarded Small Giant of "Specialized and New"
Awarded Innovative Small and Medium Enterprise
Awarded Small and Medium-sized High-tech Enterprise