Collection | home| 中文| 英文版

关于我们About us

181 7511 5423

Corporate History

Corporate History

2017

-Set up Rossum Hydrogen in Hunan


2018

- MEA full process pilot line equipment (coating, encapsulation, testing)

  delivery, commissioning, pilot production


2019

- The first fully automated MEA full process production line in China was delivered for trial production

  CCM roll-to-roll double-sided coating line delivered and put into production

  GDL sheet full production line (hydrophobic, coating, sintering) delivered and put into production


2020

- Certified as a national high-tech enterprise

  Hydrogen production line "China Good Technology"

  MEA high-speed packaging line (10PPM) was put into production

  Automatic assembly line for screw reactor/steel strip reactor delivered and put into production

  The first CCM roll-to-roll double-sided thermal transfer production line in China was delivered for trial production


2021

- Passed ISO Quality System Certification

  GG Hydrogen Global Innovative Technology of the Year Award

  CCM high-speed double-sided coating line (25m/min) completed for project closure

  GDL roll-to-roll complete production line (hydrophobic, coating, sintering) delivered and put into production


2022

- Delivery of PEMWE sheet thermal transfer equipment

  GG Hydrogen & Electric Golden Globe Product Innovation & Technology Award

  Delivery of the first hydraulic continuous press in China

  Delivery of PEMWE pilot line (coating, encapsulation, electrolysis tank)

  Delivery of Liquid Flow Battery Electrolyzer Tank Setting Equipment

  Delivery metal bipolar plate dispensing production line


2023

- Established Technology Innovation Research Institute with Donghua University

  Delivered PEM electrolyzer MEA maximum wide width fully automated packaging line

  Awarded Small Giant of "Specialized and New" 

  Awarded Innovative Small and Medium Enterprise

  Awarded Small and Medium-sized High-tech Enterprise